
Add to Cart
1.Off Road vehicles: 4×4, ATV, SUV, UTV, truck, Fork lift, train, boat, bus, and tanks 2.Engineering vehicles: Excavator, dozer, road roller, bulldozer, crane and mining truck etc. 3.Specialized vehicles: Fire engine, rescue vehicle, communication vehicle, military comm and vehicle etc.
Item no. | WM-60560 | Power | 60W |
LED | 6pcs*10W Cree LEDs | Size | 5inch |
Beam Pattern | Spot,Flood | Lifetime | 50,000hours |
Applications | LED Driving Light | Warranty | 12months |
MOQ | 1piece | Dropship | Available |
Free Customer LOGO printing | Available | Voltage | 9~30V DC |
Lead time: 2~5 days for sample order,within 15~25 days for bulk quantity
|
Paypment: Paypal, T/T, Western Union
|
Shipping:
|
Picture
A: Your inquiry related to our products or prices will be replied in 24 hours.
B: Protection of your sales area, ideas of design and all your private information.
C: Best quality and competitive price.
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.